Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Unsafe backloading of equipment - DEV imca
Skip to content

Unsafe backloading of equipment

What happened?

Project related equipment was returned to a yard in a half-height container.  The equipment came from a project-chartered vessel which had been demobilised at a nearby port.

As the half-height container was unloaded from the truck, it became obvious that the equipment inside was inadequately packed and secured.  The contents of the container included an empty intermediate bulk container (IBC) and a full propane gas cylinder.

What went wrong?

  • Inadequate active supervision during the demobilisation;
  • Low risk perception and rushing to get the job finished;
  • Failure to acknowledge or understand hazardous acts/conditions and the importance of intervention.

What lessons were learned?

  • Personnel to call an ‘All Stop’ if an unsafe act or condition is observed;
  • Vessel management should ensure all equipment is backloaded in a safe and secure manner.

This is an ongoing ‘house-keeping’ issue which can be seen in previous reports.  A few examples are included here:

Safety Event

Published: 21 December 2018
Download: IMCA SF 29/18

Relevant life-saving rules:
IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.