Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Dropped pipe incidents with potentially fatal consequences - DEV imca
Skip to content

Dropped pipe incidents with potentially fatal consequences

What happened?

During line pipe load out operations, three high potential near miss incidents occurred involving quayside crane lifting operations. All of the incidents had the potential for fatal consequences from line of fire situations. Two of the incidents resulted from the line pipe being dropped from the quayside storage positions, and the third as a result of line pipe contact with the ship’s hold bulkhead which could have caused the pipe to drop.

In all of the incidents, site activities were being directly supervised and controlled by our member’s subcontracted line pipe supplier. The operations involved a chartered heavy lift vessel, subcontracted by the line pipe supplier, to undertake the pipe load out activities.

What went wrong? What were the causes?

Our member noted the following:

  • There was no work instruction available to detail the task and process of securing and lifting pipe from the quayside into the hold of the vessel;
  • There was no requirement within the line pipe supplier’s management system to verify that their subcontractors executing the pipe load out understood and were experienced in the task, nor to verify the training and competency of those subcontractors;
  • The communication process between the banksman and crane operator was not clearly understood (there was no documented process);
  • The crane operator found it hard to see the banksman during the lifting operation, yet continued the lifting operation;
  • The pre-job briefing did not cover all of the tasks to be conducted;
  • There was a lack of experienced supervision at all stages of the pipe load out activities;
  • The quayside slewing crane used was not as suitable for the task as the gantry crane, which was not always available for use.

What lessons were learned?

  • In evaluation of potential suppliers:
    • a focus should be placed on the high-risk activities that bidders are proposing to subcontract out
    • do not assume that suppliers are knowledgeable and experienced in all aspects of their contract.

Members may wish to refer to the following:

Safety Event

Published: 10 September 2018
Download: IMCA SF 20/18

Relevant life-saving rules:
IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.