Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Crush injury to hand while attempting to secure crane hook - DEV imca
Skip to content

Crush injury to hand while attempting to secure crane hook

What happened?

While attempting to secure a crane hook to the deck handrail with a polypropylene rope, a rigger’s right hand was caught between the hook shank and the handrail.  He sustained a severe crush injury to hand and wrist, which required medical evacuation and multiple surgery.

The task involved moving the auxiliary block (weight: 26Te) of the main crane to a location on deck where it could be handled for rigging purposes.  The team decided to secure the block to the handrail.  The auxiliary block was banked into a position above the deck, before being lowered and slewed left to touch the hand railing.  Once the block was looking steady, the rigger moved in to secure the hook to the hand railing with a polypropylene rope.  This brought his right hand, which was now behind the shank, in the line of fire of the hook, which slowly moved towards the railing due to vessel rolling motion.  His hand was then entrapped between the handrail and the hook shank.  At the time of the incident environmental conditions were marginal but within operating limits.

What went wrong?

  • The method chosen to stabilise the hook was not correctly evaluated or safely engineered and the hook was still moving; this placed the rigger in the line of fire.
  • The crane block was not sufficiently stabilised;
  • The rigger moved in to secure the block before a clear signal was given from the Banksman;
  • The banksman did not stop or call back the rigger when he approached the load prior to clear signal.

What actions were taken?

  • Ensure all high-risk sub-activities are risk assessed prior to start of work;
  • Ensure that loads are stabilised before starting to work on them;
  • Ensure rigging team members comply with their roles and responsibilities.

What lessons were learnt?

  • Risk management:
    • ensure that all high-risk activities are risk assessed and properly controlled. In particular, generic worksite task risk assessments should be reviewed, to evaluate if relevant sub-activities are adequately assessed
    • stop the job if you believe a job cannot be executed safely – do not assume that others will do so;
  • Team performance:
    • ensure all team members understand their roles and responsibilities
    • follow the instructions you have been given
    • exercise the authority that you have been given.

IMCA publishes a wide range of safety promotional material which is applicable in this instance, including videos, pocket cards and safety posters.

Members may wish to refer to:

Safety Event

Published: 22 November 2019
Download: IMCA SF 27/19

Relevant life-saving rules:
IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.