Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
High potential near miss: anchor brake failure - DEV imca
Skip to content

High potential near miss: anchor brake failure

The Marine Safety Forum (MSF) have released Safety Alert 18-25 regarding a potentially fatal near miss incident during dry-docking.

A vessel’s anchors were ranged on the dock bottom for inspection and painting.  With the work complete and the vessel due to depart from the dock, the anchors were recovered.  Once recovered, the brakes were applied, guillotines on both anchors dropped across, and devils’ claws were engaged.  The clutch was disengaged and the brake on the port anchor was tightened to ensure that it was properly applied before finishing the maintenance.  At tightening the break, the threaded spindle sheared, completely releasing the break band, meaning that the full weight of the anchor was taken on by the devils’ claw.  The weight of the anchor forced the arms of the claw open, allowing the chain to run freely and the anchor and chair to run out to the dock bottom unrestricted.

What happened?  What were the causes?

Stripping the brake assembly for investigation revealed that both linkages housing the failed threaded spindle were seized.  Lack of rotation in the linkages caused a ‘bending force’ to be applied to the spindle upon tightening the break.  Over time, this has caused stress within the spindle, resulting in complete failure.

  • Maintenance:
    • maintenance on the windlass and associated parts was conducted in line with requirements of planned maintenance system (PMS)
    • all parts of the windlass were greased regularly; however, as identified in other mechanical failures, grease from the greasing nipples had not penetrated every part of the equipment, leading to the linkages becoming seized;
  • Claw:
    • the devils claw had been engaged on the anchor cable and tightened, leaving no gap or slack in the lashing
    • the two arms of the claw opened as the weight fell upon them, allowing the cable to pass through
    • there was no significant corrosion noted on the equipment;
  • Guillotine:
    • the guillotine had not been secured in place when dropped across the cable when the break failed
    • because of this, it did not effectively stop the anchor cable running out when the claw failed.
Claw as intended
Claw post incident
Failed section of brake assembly
Failed section of brake assembly
Anchor post incident

What actions were taken?

  • Conduct thorough inspections of moving parts of the anchor windlass – particularly the brake band assembly. All moving parts should be confirmed operational;
  • Routine greasing of parts to ensure proper lubrication. When greasing, moving parts should be moved to fill extent of operation to ensure full functionality;
  • Any seized or non-operational parts should be freed up at first opportunity;
  • Devils claws of the design shown were replaced with wire strops of appropriate safe working load (SWL). Alternative designs are to be reviewed by vessels;
  • All anchoring operations should include a check of the area to ensure no other part is placed at risk by the job; check over the side for any small craft at sea or in port. Exclusion zone in the proximity of the anchor during dry dock.

Members may wish to refer to:

Safety Event

Published: 21 December 2018
Download: IMCA SF 29/18

Relevant life-saving rules:
IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.