Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Unsafe attempt of personnel transfer between vessels - DEV imca
Skip to content

Unsafe attempt of personnel transfer between vessels

What happened?

Three people from a sub-contractor were observed trying to move from vessel to vessel whilst alongside, by slipping through the bulwark guardrails. There was no proper gangway in place. The personnel were stopped and company requirements on safe access between vessels was explained to them. The vessel subsequently changed its location and moored to the quayside and a gangway was deployed for safe access. Though there were no injuries, the case was raised as a near miss given the high potential for serious injury.

What went wrong? What were the causes?

Crew members or visitors should only board and disembark the vessel via a correctly rigged gangway. Different vessel types and designs should be taken into account for a safe gangway installation. Crew or visitors should not jump from the vessel to the quay or to another vessel under any circumstances; lives have been lost through failure to follow safe access procedures.

What actions were taken? What lessons were learned?

Company safety management system (SMS) requirements for safe access were re-emphasised to all relevant contractors accessing the vessel. A revision would be conducted of company checklists for visitor/3rd party safety inductions to ensure that the communication of the need for safe access & egress requirements to any visitor when accessing the vessel.

Members may wish to refer to Guidance on the transfer of personnel to and from offshore vessels and structures


IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.