Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Load exceeding safe working load (SWL) leads to overstressed and damaged rigging - DEV imca
Skip to content

Load exceeding safe working load (SWL) leads to overstressed and damaged rigging

What happened?

During a recent decommissioning operation, shears were used to cut a pipeline. The shear tool was rigged to the crane in a vertical fashion. The shear tool was placed on the pipeline at the cut location and when the shear jaws closed around the pipe to make the cut, the shear tool was pulled downward due to the ‘bird’s beak’ design of the jaws.

As a result, the load quickly increased the tension on the rigging over the safe working limit (SWL) of the rigging resulting in damage (deformation) to the rigging. The crane operator was instructed to immediately reduce load to an acceptable level.

The shear tool was placed on the seabed and the damaged rigging was removed from the arrangement. The shear tool was then re-rigged to the whip line for recovery to the surface.

This incident resulted in damage to property (hook and shackle) but could easily have been a good deal more serious, having the potential to have harmed the diver who was working close to the shear tool.

What were the causes?

The immediate causes of the incident were:

  • Failure to recognize the hazard of the shear tool pulling downward during cutting operations;
  • Inadequate preparation/planning.

The root causes were found to be:

  • Lack of knowledge;
  • Inadequate communication.

Lessons learnt

  • Placement of the shear tool and the amount of ‘slack’ available to make a cut will have an impact on the outcome;
  • Ensure SWL of rigging arrangement is communicated to crane operator prior to lifting operations;
  • Ensure rigging drawings are available. If not, a hand sketch should be prepared locally and reviewed/approved prior to lifting operations.

Members may wish to refer to the following incident (search phrase: ‘overstressed’):

Safety Event

Published: 21 December 2017
Download: IMCA SF 32/17

Relevant life-saving rules:
IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.