Winch incident
A member has reported that one of its vessels was trenching, during which time the ship was told to hold present speed with the tow wire payed in at the same time. There was no facility to spool the wire onto the drum accurately – personnel were placed adjacent to the tow wire and operated a valve using a nylon rope. This could have resulted in a serious injury and damage to equipment.
The company involved has instructed crews that the winch is to be operated remotely and, if feasible, cameras are to be used in hazardous areas. The ship’s speed should also be taken into consideration.
Safety Event
Published: 1 November 2001
Download: IMCA SF 13/01
IMCA Safety Flashes
Submit a Report
IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding [email protected] to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.
IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.
IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.