Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Umbilical termination failure and loss of ROV - DEV imca
Skip to content

Umbilical termination failure and loss of ROV

What happened?

An ROV system had just completed a test dive to 3000m and was being returned to deck.  Upon lifting the system out of the water, the umbilical became detached from the TMS bullet.  The ROV and TMS fell to the seabed and landed upside down on a firm seabed at 3276m water depth.  The vehicle was located by another ROV system from the same vessel.  The system (ROV and TMS) was inspected on the seabed.  Based on that information and the sea conditions (1.5m significant wave height), a risk assessment and a toolbox talk (TBT) were carried out which determined that recovery was both safe and possible.  The spare bullet was terminated onto the ROV umbilical to allow it to be used to recover the system with the emergency recovery rigging on the TMS.  The ROV, TMS and umbilical termination were damaged in the incident.  No personnel were injured.

What went wrong?

The parted umbilical termination was analysed by a third-party specialist laboratory.  Following a detailed engineering examination and internal investigation, it was concluded that the umbilical failed because its termination had been conducted in a very poor fashion with a number of clear defects observed.

  • It was noted that the subcontract technician doing the termination did not demonstrate appropriate skill in how to conduct such terminations, and it was clear that procedures were not followed;
  • There was an over-reliance in each link of supply chain delivering a quality product, rather than following appropriate checking or verifying of quality.

What actions were taken?  What lessons were learned?

  • Umbilical re-termination procedures were revised to provide clearer instruction and now include requirement for photographic evidence showing completion of each main step;
  • Umbilical termination considered a critical point of assembly therefore quality control processes should be followed to confirm appropriate surveillance is applied to sub-contractor.

Members may wish to refer to: 

Safety Event

Published: 21 December 2018
Download: IMCA SF 29/18

Relevant life-saving rules:
IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.