Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Sprained ankle whilst climbing on equipment - DEV imca
Skip to content

Sprained ankle whilst climbing on equipment

What happened?

A crewman slipped and sprained his ankle climbing off equipment on which he had been working.  The incident occurred inside a transition piece (the lower part of an offshore wind turbine tower).  A crewman was climbing down off a cable rack (on which he had climbed to loosen cable cleats and apply a heat blanket) when he slipped off and twisted his ankle, loosing balance and falling onto the floor.

He managed to walk back to the vessel over the walk-to-work (W2W) gangway on his own, and suffered no fractures; however, he sprained his ankle, restricting him from normal duties for three days.

What were the causes?

  • The cable rack was not designed to be climbed on; the spacing between rungs varies and does not follow the standard for fixed ladders;
  • Access to the work location on top of the cable rack was not addressed in the risk assessment and the related procedure;
  • Inadequate mitigations implemented; the narrow workspace in the transition piece does not allow the use of stepladders and work platforms.

What lessons were learned?

  • Identify hazards at design stage to ensure that safe access can be achieved;
  • Before starting work, safe access to any site should be established. If this can’t be achieved, then STOP the job and report the issue to your Supervisor;
  • Ladders and platforms – safe and appropriate to the conditions should be used and working at height processes should be followed.

Members may wish to refer to:

Safety Event

Published: 5 July 2019
Download: IMCA SF 16/19

Relevant life-saving rules:
IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.