Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Risk of electrocution during routine work - DEV imca
Skip to content

Risk of electrocution during routine work

A member has reported a recent near-miss incident in which a crew member was very nearly electrocuted. The incident occurred onboard a dive support vessel (DSV) following mobilisation, when a sub-contractor’s winch was moved between decks. A sub-contractor technician had been tasked with rerouting the winch power cable (440v 3 phase) which had a plug at the winch end and was hard-wired into the vessel supply at the other end.

It proved impractical to reroute this cable as it had been passed through a small ‘mousehole’ in a sea fastening during mobilisation and the plug was too large to pass through this mousehole. The sub-contractor technicians then attempted to remove the plug in order for the cable to pass through the mousehole. During this process one of the sub-contractor technicians felt a slight shock and realised that the cable was still live. The job was immediately stopped and their supervisor was called. The supervisor immediately asked the project electrician to isolate the supply and make it safe. The individual who received the shock was checked by the medic and had suffered no injuries.

An investigation revealed the following:

  • No toolbox talk had been held before the start of the job;
  • No permit to work or electrical isolation was in place;
  • No risk assessment had been conducted or put in place;
  • Established procedures were not followed;
  • The sub-contractor personnel did not receive adequate induction when they started the job;
  • The sub-contractor personnel involved were in unfamiliar surroundings and were not fully aware of the potential hazards of 440v mains power;
  • There was inadequate active supervision.
Plug after disassembly
Plug after disassembly

Safety Event

Published: 9 October 2008
Download: IMCA SF 15/08

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.