Man overboard (MOB) rescue lifting slings parted
A company has reported an incident in which there was a failure of lifting slings. During a MOB drill in port the dummy was brought to the MOB using a Sula Bedriftsteneste (SB) Rescue Sling, the sling was used with the davit to bring the dummy on board. The sling, under the weight of the dummy, snapped. Two other slings also parted during the exercises within a few hours at the same port.
Investigation noted the following:
- The slings were being used under ‘normal’ conditions and parted under the weight of the dummy. A copy of the manufacturer’s instructions were obtained from the supplier and it was found that the slings were close to or beyond their replacement date;
- The slings had been exposed to the elements and were probably near or beyond their replacement date. It is also possible that their integrity had been compromised when being cleaned;
- Supply dates need to be noted, test and replacement dates adhered to.
A safety alert was circulated with a requirement to check all slings. Replacement slings were ordered to replace any that are near their replacement dates. Requirements for MOB drills were changed, such that it is now required that a proper dummy (to ‘load test’) is used every other drill.
Members may wish to refer to the following similar incidents (key words: slings, parted):
Safety Event
Published: 3 March 2015
Download: IMCA SF 03/15
IMCA Safety Flashes
Submit a Report
IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding [email protected] to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.
IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.
IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.