Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Incorrect pressure-rated manifold fitted to diver's bail-out - DEV imca
Skip to content

Incorrect pressure-rated manifold fitted to diver’s bail-out

A member has reported an incident in which a manifold rated to 232 bar was fitted to a twin cylinder 300 bar bail-out.

The manifold in question had no pressure rating markings, as shown in the first picture below. The correct manifold is easily identifiable as it has its pressure rating marked clearly about the DIN female connection, as shown in the second picture.

Pressure rating of 300bar marked on manifold
Pressure rating of 300bar marked on manifold
No pressure rating marked
No pressure rating marked

The company has reminded its personnel that the fitting of correct pressure items is crucial in ensuring that a system conforms to safe design criteria and has instigated the following actions:

  • All bail-out assemblies are to be checked by dive technicians to ensure correctly rated manifolds are fitted;
  • Vessel-held stocks of bail-out manifolds are to be checked to ensure that only correctly rated and marked manifolds are in stock. Any unmarked manifolds which are identified are to be quarantined and sent back to the company’s equipment department

Safety Event

Published: 1 December 2003
Download: IMCA SF 13/03

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.