Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
High potential Near-miss: Incompatible pillar valve assembly - DEV imca
Skip to content

High potential Near-miss: Incompatible pillar valve assembly

A member has reported a high potential near miss incident, in which there was a failure of a pillar valve in a diver’s bailout set. The incident occurred during preparation for diving operations, requiring three twin bailout sets. Upon completion of assembling the three bailout sets, two sets were charged with a gas mix of He/02 (80/20%) to 300 bar. The first two twin sets were filled with no concerns being noted. Filling was undertaken in accordance with industry standards and company procedures.

The third bailout to be charged was attached to the charging whip, secured and bailout opened. The Haskell supply valve was opened to decant the gas mix into the twin bailout set. The bailout was equalised to approximately 130 bar. The filling process was undertaken to fill the third twin set to the required pressure for diving operations. A small leak was detected at the charging whip connection to the bailout. This resulted in the repositioning of the bailout in the charge tank, so that the twin bailout set was submerged. This action was undertaken to assist in the cooling of the twin bailout and in the detection of leaks. Within less than two minutes there was a loud explosion/release of gas from the charging tank. The gas supplied was immediately isolated. Upon inspection it was identified that the pillar valve failed to hold the content of the cylinder.

Twin bailout after incident
Twin bailout after incident
Broken manifold assembly
Broken manifold assembly
Broken assembly
Broken assembly

Our member’s investigation noted the following:

  • Different types of cylinders (imperial and metric) were being used on the same job site;
  • There was no management of change (MOC) process undertaken, to change pillar valve to twin manifold configuration;
  • Additional force was applied to insert new pillar valve (no inspection undertaken as to why there was a resistance).

Our member took the following corrective actions:

  • Replacing bailout cylinders with metric only;
  • Vessel technicians to be supplied with a precision measuring instrument (for measurement of thread patterns);
  • Training to be undertaken by dive team / project department pertaining to the use of MOC;
  • Implement system that ensures only metric thread cylinders and components used;
  • Marking of all metric and imperial parts and cylinders to be undertaken for ease of identification.

Safety Event

Published: 20 December 2013
Download: IMCA SF 18/13

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.