Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
First aid injury: Electric shock - DEV imca
Skip to content

First aid injury: Electric shock

A member has reported an incident in which an ROV Supervisor suffered an electric shock. The incident occurred during ROV fault finding activities. The ROV Supervisor mistakenly accessed a transformer cabinet in the ROV Power Distribution Unit (PDU) room associated with a 2nd/alternate ROV system. He made contact with a conductor inside the transformer cabinet and sustained an electric shock which resulted in a burn to the hand requiring first aid treatment.

The power distribution system that was the focus of the fault finding activities was correctly isolated, inclusive of the discharge of stored capacitance energy, via the application of an HV spider earthing tool. The ROV system mistakenly accessed was not in use at the time, with breakers switched to the off position. However, it was receiving 40V DC from the Line Insulating Monitoring (LIM) system and was potentially a source of additional High Voltage stored capacitance energy.

The lessons learned:

  • Personnel should not rely on administrative [safety] controls as the main form of defence;
  • Permit to work and job hazard analysis are important planning tools; however, these should be used in conjunction with hard controls at every opportunity;
  • Access to transformer cabinets and other HV energy sources should be restricted by way of lock out/tag out and a robust approval process;
  • Familiarisation with the configuration of systems associated with safety critical equipment at a specific work site should be verified before approval to work is granted;
  • The importance of clear labelling and the ability of crew to differentiate between similar sets of co-located equipment should be considered during installation of all safety critical equipment;
  • System-specific isolation checklists and procedures should be applied to safety critical equipment;
  • Stored energy should be released from offline equipment where operationally practicable;
  • The practice of ‘test before touch’ should be reinforced as a formal requirement prior to accessing any electrical systems component.

Our members’ recommendations and corrective actions were as follows:

  • Review and update training and procedures to identify controls applicable to HV activities including:
    • ROV specific isolation checklist
    • Labelling/colour coding requirements for the ROV system
    • Cabinet lock management
    • Use of warning signs
    • Approved personal protective equipment (PPE) and hand tools
    • Rescue equipment, test before touch
    • Offline equipment isolation requirements
    • Adequacy of job hazard or risk analysis.

Members may wish to refer to the following incidents (search word: shock):

Members may also wish to refer toOffshore vessel high voltage safety.

Safety Event

Published: 6 December 2016
Download: IMCA SF 33/16

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.