Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Fire inside Falcom steamer - DEV imca
Skip to content

Fire inside Falcom steamer

We have received a report of an incident which began when a night cook baker, returning to the galley after his break, smelt burning. He then noticed that there was smoke coming from the top of the steamer. He then informed the facilities manager, who accompanied the baker to the galley to investigate. The manager slowly opened the steamer door and could see that the elements on the base of the steamer were glowing red. A fire then ignited. The manager immediately closed the door to contain the fire within the stainless steel unit and then switched off the power from the main control panel.

The fire was extinguished by starving it from oxygen. The OIM was informed immediately and assessed that the machine was made safe and an investigation would be completed.

Investigation showed that there was a blockage in the pipe that feeds the water into tank and unit. There was no system that warned of lack of water to the unit and no fail-safe, e.g. the thermostat cut-off to the elements.

The company’s subsequent recommendations were as follows:

  • A daily visual check to be made to ensure water is flowing freely to the units.
  • Contact manufacturers to enquire if a fail-safe device could be installed within this unit.

Safety Event

Published: 1 September 2003
Download: IMCA SF 11/03

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.