Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Fatality during maintenance of elevator lift - DEV imca
Skip to content

Fatality during maintenance of elevator lift

The following fatality, which occurred during a routine maintenance task on an elevator lift installed on a rig, has been reported to IMCA. The task being undertaken was to change the wire that raised and lowered the lift. During the operation, the securing arrangement used for this maintenance task failed and the lift fell over 100 feet to the bottom of the lift shaft. The Barge Supervisor was on top of the lift when it fell and he died of his injuries.

At present, the exact details of what happened have not yet been fully established, but the company concerned and the UK Health & Safety Executive (HSE) are conducting detailed investigations into the incident.

The company concerned has undertaken to carry out the following actions:

  • Maintenance activities are to be reviewed and risk assessed to ensure that there are adequate controls in place before the start of a job. This may mean that additional assessment procedures will need to be drawn up for more complex activities;
  • The requirements of the UK Region Permit To Work (PTW) procedures are to be studied. Department heads, in conjunction with the OIM shall review and, if appropriate, reinforce the PTW system for maintenance activities.

Safety Event

Published: 1 November 2001
Download: IMCA SF 13/01

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.