Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Electrical power supply to ROV equipment - DEV imca
Skip to content

Electrical power supply to ROV equipment

When wiring up the trailing lead of a piece of ROV equipment to a junction box on the ship’s electrical supply, an electrician incorrectly identified the trailing lead wires and connected the ROV equipment earth to a live phase on the 440 volt 3 phase supply. A key factor in this error was that the yellow covering on the phase wire of the trailing lead had a dark bank along it due to pigment discolouration from the outer cable sheath which led the electrician to presume it to be yellow/green earth.

On powering up, the Superintendent received an electric shock. This incident again highlights that ROV equipment and site conditions in which it is used invariably involves potentially fatal electrical supplies. The integrity of electrical wiring to such equipment can fail.

The contractor involved has proposed the following:

  • ensure that continuity and earth checks are carried out after wiring or modifying any electrical equipment regardless of confidence in integrity of wiring
  • those in charge of ROV equipment at site should be reminded that they are responsible for powering up such equipment and in every case it is essential that they seek and get formal assurance that continuity and earth tests had been carried out both on receipt and site of such equipment or after any modification to electrical supplies

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.