Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Dangerous occurrence involving a mobile crane - DEV imca
Skip to content

Dangerous occurrence involving a mobile crane

A member has notified us of a serious incident involving a mobile crane onboard one of its vessels. The crane was being utilised to install a spool piece subsea. The crane was severely overloaded and its track lifted off the vessel deck as it started to topple over. The load was released and the crane fell back to deck, suffering extensive damage in the process. The overload protection mechanism on the crane had been deactivated.

The company involved has notified all of its vessels and work sites, which were requested to inspect their cranes and lifting equipment to ensure that all overload protection mechanisms are installed, operational and activated.

It has stressed that no unauthorised modifications of lifting equipment are permitted.

The company has also reiterated its policy for lifting operations, which includes ensuring:

  • any safety devices installed on lifting equipment are operational and activated;
  • the load does not exceed the dynamic or static capacity of the lifting equipment, in accordance with the conditions on the approved capacity chart for the lifting equipment;
  • the actual load has been verified, including a test, if necessary.

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.