Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Damaged wire rope slings - DEV imca
Skip to content

Damaged wire rope slings

A member has reported an incident in which rope access personnel were found to be using damaged wire rope slings, which could have led to a dangerous situation and/or accidents.

Damage to wire rope slings
Damage to wire rope slings
Damage to wire rope slings
Damage to wire rope slings
Damage to wire rope slings
Damage to wire rope slings

Our member took the following actions:

  • All wire rope slings were inspected and checked before use at site (visual inspection) for deformities and wear and tear;
  • Test certificates to be inspected before slings are used at site/yard;
  • Ensured personnel were fully aware of this issue;
  • Proper personal protective equipment (PPE) should be worn while lifting/handling slings;
  • Manufacturer of the slings notified in regard to any defects/cuts/kinks in wire rope slings;
  • Damaged wire ropes and slings should be removed from service immediately.

Members may wish to refer to:

Safety Event

Published: 20 February 2014
Download: IMCA SF 02/14

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.