Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Lifting and rigging plans - DEV imca
Skip to content

Lifting and rigging plans

The Australian National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) published the following safety flash regarding the importance of lifting and rigging plans in safe lifting. Recent NOPSEMA investigations of dangerous occurrences during non-‘routine’ lifting and rigging activities, which resulted in dropped objects and failed rigging equipment, have identified a trend in the absence of effective lifting and/or rigging plans for an operation or partial completion of a plan which was considered ineffective.

The safety flash can be downloaded from nopsema.gov.au/assets/alert/Safety-Alert-59-Lifting-and-Rigging-Plans.pdf

Members may wish to refer to the following similar incidents in which inadequate lift planning was a contributory factor: (keywords lift, plan, planning):

Members are encouraged to reiterate the importance of lifting planning to their personnel. Further information on lifting and lift plans can be found from Guidelines for lifting operations.


IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.