Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Lost time injury (LTI): Serious hand injury during subsea lifting operations - DEV imca
Skip to content

Lost time injury (LTI): Serious hand injury during subsea lifting operations

A member has reported an incident in which a diver injured his hand during subsea lifting operations. A diver was about to pull a 4m round sling (20 ton SWL) through a master link. While he was hanging the two-headed sling eyes on the corresponding hang-off point, his right hand thumb and index finger were sandwiched between the sling and hang-off point, resulting in a crush injury. The diver reported this to the dive supervisor immediately, and the supervisor arranged for emergency recovery of the injured diver. After he was recovered to surface, he received emergency medical treatment before being evacuated ashore by helicopter.

Injured hand
Injured hand
Illustration of the right hand position holding the sling (simulated)
Illustration of the right hand position holding the sling (simulated)

The company’s investigation revealed the following:

  • The hang-off point was relatively short, approximately 13cm (see figure above right), while the diameter of the sling was 6cm, and the thickness of the two-headed sling eyes was 12cm;
  • The sling had a tendency to come off the hook under the influence of wave surge;
  • The moment the diver finished and left the area to wait for the lifting operation, the sling became unhooked, resulting in it being necessary for him to return and repeat the operation several times;
  • After repeating the operation several times, the diver became irritable and grasped the sling in an incorrect way, putting himself in danger, resulting in the injury;
  • The diver was working in the splash zone; the swell made it very difficult for him to control himself. The diver had reported that his bailout cylinder and helmet frequently hit the underwater structure.
Hook-off point in splash zone
Hook-off point in splash zone
Diagram of revised operation procedure
Diagram of revised operation procedure

Following safety stand-down, medical evacuation of injured person and appropriate discussion of the incident, the company took the following actions:

  • Banded the 4m x 20Te SWL round sling and created plan to use two tail ropes to pull the round sling, avoiding the occurrence of unhook;
  • Ensured all the divers understood about the change in work procedures.

Safety Event

Published: 11 December 2012
Download: IMCA SF 13/12

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.