Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Near-miss: safety device (hard link) damaged during hot work - DEV imca
Skip to content

Near-miss: safety device (hard link) damaged during hot work

A member has reported an incident in which a rope access technician (RAT) damaged his safety equipment during hot work. The technician was gouging out the weld connection around 8 metres above deck. He was working next to his two climbing ropes and was also secured with a hard link. This hard link was connected to the D-link of the technician’s harness and to a secure point above the technician.

At the moment the RAT opened the air flow to start gouging, water streamed out of the nozzle instead of air. This resulted in the technician instinctively pulling back the gouging torch. During this uncontrolled movement, the gouging torch connected with the stop descender -a steel part of the technician’s climbing gear. Since the technician was connected using a hard metal link to a beam on the platform, the technician’s metal climbing equipment made an electrical circuit to earth and current flowed from the gouging torch. As a result, three of the six strands of the hard link were burnt through.

The RAT descended safely to the walkway 8 meters below to check and replace the damaged equipment and subsequently was able to safely resume work. There were no injuries.

Following investigation, the following was suggested:

  • Replace metal hard-link with a non-conductive nylon climber’s sling;
  • Ensure water is drained out of air supply before use with gouging torch.
Typical metal 'hard-link' for rope access technicians
Typical metal ‘hard-link’ for rope access technicians

Safety Event

Published: 27 September 2010
Download: IMCA SF 06/10

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.