Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Parting of slings causing fall of heavy object onto seabed - DEV imca
Skip to content

Parting of slings causing fall of heavy object onto seabed

A diving support vessel was installing a 24 tonne metallic cover onto a subsea valve. When this large object was deployed over the side of the vessel into the water, the four 15 tonne round slings used in the rigging arrangement parted and the object fell into the seabed. There were no injuries or damage to equipment or seabed infrastructure as, in accordance with the company’s procedures, the lift was made over a seabed area free of any field infrastructure.

Investigation revealed that the four round slings obtained from a local supplier had been modified incorrectly and without due authorisation from the original manufacturer.

  • Close examination of the slings revealed that the fibre had been cut and re-spliced using numerous knots, hidden under the protective fabric (this could not have be spotted without dismantling the sling)
  • Whereas 6 metre (working length) slings had been procured from the local supplier, the manufacturer advised that the serial number on the round slings actually corresponded to 12 metre (working length) round slings. The manufacturer also advised that it did not fabricate 6 m (working length) round slings of 15 tonne SWL
  • There was no manufacturer certificate for the slings available from the supplier
  • The blue label showing SWL was stitched to the sling, when it normally should slide around it.

The company noted the following actions:

  • Rigging equipment shall in future only be procured from approved and recognised suppliers
  • Rigging materials are to be always subject to testing and inspection as required by the applicable international standards and company rules
  • Exceptions to the above should be subject to a rigorous and thoroughly documented management of change process covering all aspects of the rigging operation.

Safety Event

Published: 18 September 2006
Download: IMCA SF 11/06

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.