Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Falling object - Load dropped by crane - DEV imca
Skip to content

Falling object – Load dropped by crane

We have received a report of a crane incident that happened in connection with the transport of a riser joint from pipe shuttle to pipe storage deck. In order to transport the riser joint to the pipe storage deck, it was lifted up approximately 1 metre with a gantry crane (pipe handling crane). The crane hook loosened from the hook block fastening point and both the hook and the riser joint fell down again into the pipe shuttle. The 12m long pipe weighed 7.3 tonnes. No persons were in the area during the incident.

The company discerned that the immediate causes of the incident were:

  • worn-out threads; and
  • ‘play’ in the hook;

with underlying causes including:

  • the ‘play’ in the hook had been reported earlier but this had not been followed up;
  • check ‘routine’s had been insufficient;
  • mounting failure was possible;
  • there had been insufficient control; and
  • the hook fastening was badly designed.

The following actions were recommended:

  • Immediate:
    • Establish relevant check ‘routine’s;
    • Control other similar hooks/lifting arrangements;
    • Contact supplier.
  • Further:
    • Soft material inserts to be replaced and a better designed hook to be installed;
    • Total survey of technical condition of crane to be executed;
    • Operating time to be evaluated;
    • Checks to be carried out to ensure that all necessary certificates for lifting equipment are in place and easily accessible.

Safety Event

Published: 31 January 2006
Download: IMCA SF 01/06

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.