Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Failed shackle on vessel life raft - DEV imca
Skip to content

Failed shackle on vessel life raft

What happened?

There was a failure of two stainless steel “D” shackles forming part of a life raft hydrostatic release assembly on a vessel.  This was discovered whilst the vessel was in the 500m safety zone of an installation.  A crew member noticed one of the vessel’s starboard life raft containers was in the water.  The life raft was still attached to the vessel via the painter (rope).  The crew member immediately notified the bridge team who stopped all non-essential operations and informed the installation.  The vessel deck crew attempted to recover the life raft intact by using the painter; however, the life raft inflated.  The inflated life raft was secured to the side of the vessel which then departed the 500m safety zone and safely recovered the life raft to deck.

What went wrong?

The failed/parted shackles released the strap securing the life raft container to its stand.  As a result, the life raft container fell into the water but remained connected to the vessel via the painter.  The life raft inflated (as expected) when tension was applied to the painter.  The shackles potentially failed due to crevice corrosion over time.

What actions were taken?

  • Appropriate authorities were informed, and arrangements were made to replace the inflated life raft;
  • All remaining life raft stainless steel shackles were replaced;
  • Inspections were carried out to identify vessel equipment with potential for crevice corrosion and galvanic corrosion;
  • Weekly checks to be carried out on the condition of shackles during weekly life raft inspection;
  • The preventive maintenance schedule was improved to ensure the timely replacement of such stainless steel shackles before they fail.

Members may wish to refer to:

Safety Event

Published: 17 December 2019
Download: IMCA SF 30/19

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.