Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Fatality results from failure of ship's mooring fittings and supporting structure - DEV imca
Skip to content

Fatality results from failure of ship’s mooring fittings and supporting structure

he following incident report has been received via the IMO Sub-Committee on Ship Design & Equipment. Although the incident itself is not very recent, the full details have only just been made public. It is worth highlighting because it underlines the importance of keeping a careful check on the structure around the parts of a vessel which are subjected to great forces, such as mooring fairleads. This is especially the case with an aging of heavily worked vessel, despite one which is ‘in class’.

The incident concerns a vessel built in 1982, with an overall length of just over 105 metres and a gross tonnage exceeding 3,800. There were four fairleads on the forecastle deck, two on each side (the ‘shoulder’ fairleads). The fore fairleads consisted of three 200mm diameter rollers and a baseplate measuring 500mm wide by 1,600mm long by 12mm thickness. The ISM shipboard safety inspection manual required that the operating condition of the fairleads be checked every three months. When they had been checked approximately 2 months before the incident, the chief officer had found them to be in apparently good condition.

The vessel had berthed alongside a pier, letting go its starboard anchor with three shackles in the water to the direction of 3 o’clock. Every mooring line, except a bow spring line, was made fast to the shore bitts through each appropriate mooring hole or each fairlead. However, the bow spring line was connected to a shore bitt via two fairleads, in order to prevent the line from chafing against the shell plate, i.e. the spring line from the winch was taken forward to the fore fairlead, around a roller of the fore fairlead to the aft fairlead, then out to the shore bitt (see figure). The mooring lines were polypropylene fibre ropes with a diameter 65mm.

The vessel was departing the port in fine weather and with calm sea conditions. The chief officer was watching the anchor chain tension, the boatswain was behind the windlass, operating the controls, and the other members of the deck crew were beside the port side fairlead, stowing the mooring lines away. The Captain ordered all lines to be cast off, except a bow spring line, then ordered hard-a-port steering and ‘dead slow ahead’ for about 10 seconds.

The spring line tightened and the ship moved away from the pier. The base plate of the fore fairlead (see inside dotted circle) was torn away from the forecastle deck because of the strong tension on the line. The spring line flew out of the fore fairlead, was catapulted back and hit a crew member on his head. He died quickly.

The torn base plate of the fore fairlead was inspected thoroughly after the incident. One third of the welded part was rusted and cracked, even though the apparent condition had been good.

Fairleads are generally used to change the direction of the mooring rope when there is an obtuse angle from a ship to a pier. However, any unconventional mooring line arrangement that shortens the angle crates much stress on the fairleads and causes potential hazards. Therefore, established rules regarding the proper use of fairleads and the strength of supporting structures are needed. Clearly, structural components subject to high stress loadings need careful and regular inspection and the design of mooring equipment should be arranged so as to prevent lines from chafing with shell plates.

Safety Event

Published: 1 February 2003
Download: IMCA SF 02/03

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.