Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Eureka wire locks - DEV imca
Skip to content

Eureka wire locks

An incident which involved the inadvertent release of a taut wire dump weight recently occurred on a member’s vessel. The incident itself did not result in any injury, damage or loss of position. DP trials were being conducted in open water and the taut wire dropped to the seabed.

The cause of the incident was due to the wire being pulled through a Eureka wire lock. This occurrence, identified a discrepancy between the manufacturer’s recommendations and guidance available on the use of these wire locks.

The manufacturer recommends the use of a single wire lock clamp to make an end termination. However, the International Rigging and Lifting Handbook (1997 edition), printed by North Sea Lifting, used by the contractor, recommends two Eureka wire clamps are fitted irrespective of the rope diameter.

The member has now issued instructions that when using Eureka wire locks, two are fitted to make a termination.

The member has also included the following in their instructions:

“The bolts supplied with the wire locks are of a high quality to meet the torque values and should never be replaced with standard bolts. In addition the bolts should be tightened to the correct torque values using the correct torque tools.”


IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.