Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Smouldering coiled extension cable - DEV imca
Skip to content

Smouldering coiled extension cable

What happened?

While ventilating a manhole in the engine room, the fire alarm was triggered when an electrical extension lead overheated, melting the insulation and started smouldering.

What went wrong?

Investigations confirmed that the electrical extension lead was not laid out in the correct manner and was still around 80% coiled.  Also, the extension lead was the incorrect specification for the task of providing power to the blower.

What were the causes?

  • Seafarers were unaware of the need to run out all the extension lead when using them;
  • The extension leads available on board were not of an appropriate or correct specification.

What lessons were learned?

  • Provide correct, fit for purpose specification extension leads;
  • Ensure coiled electrical leads are unwound totally prior to use and include such instructions in safety management system (SMS) and on coil casing;
  • Positive: all fire systems were operational, checked, drilled and crews reacted immediately alarm sounded.

What actions were taken?

  • Thorough audit of all extension leads to ensure correct specifications, and removed all non-approved leads;
  • Add electrical lead management to power and hand tools procedures, training and challenge tests in vessel SMS.

Members may wish to refer to:

Safety Event

Published: 12 August 2019
Download: IMCA SF 19/19

Relevant life-saving rules:
IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.