Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Electrician fatally electrocuted - DEV imca
Skip to content

Electrician fatally electrocuted

An on-call electrician from the maintenance department was called and to check on a malfunction at a land-based oil installation. Besides checking the wells, he also went to the substation pole. At the substation (on poles), he opened the padlock at the low voltage (LV) distribution board and he disconnected the loads for all seven wells at the site by operating the two shutdown switches (circuit breakers).

Afterwards, the electrician climbed onto the pole and went on the platform to check – very likely – if the high voltage fuse was broken. Once on the platform, he was in the ‘dead zone’ (approximately 1m around 20kV installations) and he was almost immediately electrocuted as a result of an arc-blast. The electrician was found dead on the ground (having fallen from height as well) with severe burns on his back and on his left hand.

What went wrong:

  • Inadequate risk assessment/JSA – the electrician was in a hurry, under self-imposed pressure and distracted, which did not allow him to properly assess the risks;
  • Weaker safety culture during weekends – safe working rules were less likely to be followed during the weekend;
  • Complacency – no one in the organization stopped the electrician working alone on the electrical activities (and also working at height);
  • Poor electrical reliability/availability of aged electrical equipment – equipment was compromised and degraded owing to age and poor maintenance;
  • Poor safety and security of electrical facilities – there was easy access to the live parts;
  • No up-to-date electrical schematics and checklist available at site;
  • PTW – there were no competent personnel reviewing and approving electrical work permits. There had been previous fatal incidents from which lessons had not yet been learnt;
  • Poor work planning – the maintenance organization did not have sufficient personnel to safely deal with these preventive and corrective maintenance jobs.

Corrective actions:

  • Structural upgrade of old equipment;
  • Review PTW procedure for electrical jobs, sign off by electrical supervisor, in addition to sign off by production co-ordinator and review the roles; . Implement fully the recommendations of the previous electrical fatality incidents (including locking, signing, obstructing) and do a root cause analysis why recommendations were not implemented;
  • Implement an additional mechanical barrier at distribution cabinet to prevent lone working;
  • Ensure checklists and instruction documentation are available in every distribution cabinet;
  • Enhance safe behaviour and improve safety culture by:
    • implementing safety behaviour based program
    • consequence management (planned), including the complacency component for supervisors and managers
    • consider implementing spot checks and management walk-arounds during weekends/call off periods;
  • Identify clearly what kind of critical works should take place at weekends and at other times.

Safety Event

Published: 2 October 2015
Download: IMCA SF 14/15

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.