somdn-pro
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6121woocommerce-services
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6121woocommerce-conditional-shipping-and-payments
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6121woocommerce-eu-vat-number
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6121woocommerce-memberships
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6121woocommerce-order-status-control
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6121woocommerce-sequential-order-numbers-pro
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6121imca-website-2020
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6121“Thirty centimetres of safety”<\/em><\/strong><\/p>\n The UK Rail Accident Investigation Branch (RAIB) has published its report into the detrainment of passengers onto electrically live track near Peckham Rye station on 7 November 2017.<\/p>\n What happened?<\/strong><\/p>\n A train with 450 passengers on board failed just outside a railway station during the evening rush hour. The fault on the train had caused the brakes to apply and the driver was unable to release them. The driver took advice over the radio and, following this, began to evacuate the passengers to track level. This involved passengers climbing down vertical steps to ground level, to within 30 centimetres of the live electric conductor rail (750 V direct current), and walking along the side of the line for about 30 metres to the station.<\/p>\n Although no-one was hurt in the incident, the close proximity of the energised conductor rail to the evacuating passengers posed a significant risk of serious harm.<\/p>\n What went wrong? What were the causes?<\/strong><\/p>\n What lessons were learned?<\/strong><\/p>\n Although this safety flash incident is not directly related to the offshore industry, the learnings are central to the way IMCA members do business, in particular with relation to crisis management, dealing with incidents, and with crewing levels, training and competence of staff in a lean market.<\/p>\n The UK Rail Accident Investigation Branch report can be found here<\/a>.<\/p>\n An article on the incident from London transport website www.londonreconnections.com<\/a> can be found here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":" “Thirty centimetres of safety” The UK Rail Accident Investigation Branch (RAIB) has published its report into the detrainment of passengers onto electrically live track near Peckham Rye station on 7 […]<\/p>\n","protected":false},"template":"","tags":[],"safety_event_tag":[97,104],"class_list":["post-16449","safety-events","type-safety-events","status-publish","hentry"],"acf":[],"yoast_head":"\n<\/p>\n
\n
\n
\n
\n