Example redundancy concept and annual DP trials for a DP class 3 construction vessel

Contents
  • List of Abbreviations
  • Introduction
  • Vessel Overview
  • Engines and Auxiliary Services
  • Power Generation
  • Power Distribution
  • Power Management System
  • Vessel Management System
  • Thrusters
  • DP Control System
  • Safety Systems
  • Overview of Tests Created by Analysis of Redundancy Concept
  • Appendix – Example Annual DP Trials Report
Reference(s): IMCA M 225
Published:October 2014
Version:New Publication
Grade:
Category:
Tag:

Members should log in to access downloads
and discounted pricing on physical items.