Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Vessel mast struck bridge – equipment damage - DEV imca
Skip to content

Vessel mast struck bridge – equipment damage

A member has reported an incident in which the aft mast of a vessel struck an overbridge and broke, damaging the navigation lights on the mast. The incident took place during a transit of a ship canal in the United States. The aft mast of the ship struck the lower span of a raised vertical lift railway bridge. The aluminium mast post broke just above the base. As a result, the navigational lights on the mast post were damaged beyond repair. The mast fell safely on the funnel top and no persons were injured. The local United States Coast Guard (USCG) Captain was notified of the incident and the vessel continued to its next port of call, where repairs were conducted.

Our members’ investigation noted the following:

  • Causal factors:
    • inadequate procedures – incorrect air draft used in Pilot-Master exchange, Pilot Card, Ship Particulars and Manoeuvring Poster
    • vessel not operated as per company procedures
    • inadequate communication – previously identified concerns relating to the transit through the canal were either not disseminated to current staff or were not taken into consideration during transit;
  • Root cause:
    • confusing, contradictory or incomplete management system – vessel documents contradictory and partly incorrect with regards to air draft
    • enforcement issue – shipboard management failed to enforce proper use of company procedures;
  • The bridge team were not familiar with their own company procedures or manuals, and when asked, took quite some time to locate it (hard copy or electronic version);
  • The air draft for the vessel had not been calculated. A predetermined static figure was used and compared with the height of whatever structure they would be transiting under;
  • The static figure used was the air draft of the vessel in summer conditions, even keel and with mast lowered. This figure was used as air draft on the Pilot Card and confirmed verbally between the Pilot and the Master. No mention was made of the need to lower any mast;
  • The General Arrangement Plan posted on the bridge clearly indicates that the figure for air draft must be with the mast down. However, other documentation contradicted this, and no-one on the crew could provide any clarification;
  • It was known by members of the previous crew that to allow the vessel to pass safely, there would need to be ideal tidal conditions and the mast would have to be lowered. It appears that this information was not passed to the bridge team.

In summary, there was incomplete planning of the voyage, inadequate communications, and a lack of understanding or proper assessment of all the risks involved. Of particular note is the fact that vessel air draft is a dynamic figure and should be calculated on a case-by-case basis


IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.