Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Stored pressure near-miss: Buckle detector expelled from pipe during recovery - DEV imca
Skip to content

Stored pressure near-miss: Buckle detector expelled from pipe during recovery

A member has reported a near miss incident in which a buckle detector tool was expelled from a pipeline under pressure and landed approximately 2m away. The incident occurred during retrieval of the buckle detector (BD), which weighed approximately 25 kg. The buckle detector came close to two crew members. Had either of them been struck by the tool as it ejected, it could have caused significant injuries.

Trajectory of BD and point of impact on railings
Trajectory of BD and point of impact on railings
25kg buckle detector
25kg buckle detector

Our member’s investigation revealed the following:

  • Back pressure on the buckle detector had not been identified as a risk during the job risk assessment (JRA);
  • The task plan did not identify appropriate barriers required for the job;
  • The procedure for use of the buckle detector was not risk assessed at the hazard identification and risk assessment (HIRA) stage of the project.

The actions were:

  • An ‘all stop’ on buckle detector launch and recovery activities followed by .time out for safety. with all personnel
  • An updated task plan to:
    • ensure ‘no go’ areas are fully documented
    • show means of preventing future recurrence by using a double wrapped sling on the pipe attached to a shackle on the buckle detector cable;
  • Ensure plans available of where barriers should be installed to keep people out of the ‘line of fire’ when conducting launch and recovery of buckle detector;
  • Consider revision of hazard identification and risk assessment (HIRA) and job risk analysis (JRA) for pipe buckle detection work;
  • Consider pipe back pressure as a risk;
  • Ensure future buckle detection task plans include clear instructions on where to install barriers;
  • Identify other means of launching buckle detector, such as crawler systems which do not require pressurised air.

Members may wish to refer to the following incident (search words: pipe, plug):


IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.