Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Provisions Crane damaged by Main Deck Crane - DEV imca
Skip to content

Provisions Crane damaged by Main Deck Crane

What happened?

During vessel mobilization the boat cradle had to be shifted from centre of the main deck towards the starboard side closer to the accommodation. The Main Crane was used for this lift and the Provisions Crane was parked in standby facing aft. While slewing the Main Crane to starboard, the Main Crane jib crane came into contact with the jib on the Provisions Crane. The Provisions crane was inspected after impact and mechanical damage was found on the slewing gear and pinion gear.

What were the causes? What went wrong?

  • The Provisions Crane was in the blind spot of the Main Crane operator cabin;
  • The Banksman was focusing on the lift and not the position of the Provisions Crane;
  • The Provisions Crane had been left parked facing aft in standby;
  • The person who had most recently operated the Provisions Crane had not been part of the mobilization plan toolbox talk.

Actions

  • All crew and mobilization team to be included in the mobilization plan toolbox talk;
  • A procedure would be implemented for parking the Provisions Crane;
  • An emphasis would be placed on communication and awareness for the crane operator and banksman as well as the mobilization team.

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.