Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
LTI: Leg Fractured While Loading Tubulars - DEV imca
Skip to content

LTI: Leg Fractured While Loading Tubulars

What happened?

A load shifted during cargo operations, pinning a crewman’s leg between the deck and the load, causing a broken leg. The incident occurred on a vessel which was in port to load cargo. The cargo consisted of various items including containers and multiple bundles of tubulars. The crane driver lifted the tubulars into position with the deck ratings providing voice communication to ensure that the load was in the correct position. Once confirmed correct, the crane driver payed out the crane wire allowing the deck ratings to disconnect the sling from the lifting hook. Shortly after disconnection, the load shifted striking an AB in the left leg, pinning his leg between the deck and the tubulars.

What went wrong?

  • The task of loading tubulars was considered routine and therefore was not risk assessed adequately;
  • The likelihood of the tubulars not being secure and moving once landed had not been identified as a risk, and the injured AB was positioned in the line of fire with nothing to prevent the tubular load striking the leg.

What were the causes?

  • Risk Management processes did not identify hazards associated with task;
  • Personnel were positioned in line of fire with no physical means of holding moving load;
  • Vessel relied on a third party onshore provider to bundle load correctly with no checks.

Lessons learned

  • Supervision and checking of loads is required prior to each lift, especially from third party providers;
  • Multiple bundles of tubulars were lifted in a single lift. The bundles should either be lifted separately or moussed together;
  • Physical means of holding loads (pins/chocks) should be deployed in case of potential moving load;
  • Positive: the injured person was properly treated because the medical emergency procedures were well drilled and practiced.

Actions

  • Ensure agreed lifting plans and configuration of unusual loads with third party or client prior to lift;
  • Vessel crew should inspect and supervise the loading process;
  • Deploy pins or chocks to prevent load moving to impact personnel;
  • Personnel reminded not to stand in line of fire during/ or post lift.

Members may wish to refer to

Safety Event

Published: 15 September 2020
Download: IMCA SF 27/20

Relevant life-saving rules:
IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.