Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Lost time injury (LTI): Serious foot injury - DEV imca
Skip to content

Lost time injury (LTI): Serious foot injury

A member has reported an incident in which a rope access technician suffered a serious injury to one of his toes, leading to partial amputation. During J-lay pipeline operations, a malfunction was discovered in the locking pin designed to lock off the hang-off clamp (HOC). The pin would move down, but not up. Maintenance of the equipment was arranged. A crewman was assigned to clean the hang-off clamp using a water jet, and during this process he was supervised, from the deck level, by the Chief Engineer and 1st Engineer. When the cleaning was complete, he confirmed using hand signals to his supervisors that the job was complete.

The supervising team alerted the crewman that there would shortly be a test movement of the locking pin in order to test the functionality of the equipment. The supervising team alerted the crewman of the imminent movement of the pin, giving signals that he should move to a safer location. He confirmed visually that he had received this signal, but did not move, remaining with his foot on the pin. The 1st Engineer gave instructions via radio that the pin should be moved. Whilst moving, the pin squeezed the toe cap of the crewman’s boot, causing injuries leading to partial amputation of his right big toe.

Hang-off clamp locking pin (circled)
Hang-off clamp locking pin (circled)
Line drawing showing place of incident and position of persons involved
Line drawing showing place of incident and position of persons involved

An investigation identified the following causes:

  • Improper communication between all persons involved:
    • injured person and supervisory team communicated using hand and visual signals and there was no confirmation that the signals were understood as intended
    • 1st Engineer and control room operator communicated by radio
    • There was no communication between injured person and control room operator;
  • The control room operator could see the hang-off clamp, but could not see personnel working nearby;
  • There was no evidence of any toolbox talk before the operation to agree on proper communication channels or planning of the operation;
  • Whilst a job safety analysis and permit to work had been issued, these did not fully identify the task hazards.

The following corrective actions were taken:

  • Improved job safety analysis to ensure adequate identification of all hazards and mitigation measures;
  • Improved communication protocols and instituted use of common communications channel between crew and control room.

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.