Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Lost anchor chain - DEV imca
Skip to content

Lost anchor chain

IMCA has received a report of a vessel losing one anchor and four lengths of chain cable during anchor handling. During the vessel’s previous dry docking, a number of chain cable lengths had been renewed on both port and starboard sides, including a number of Kenter shackles (joining shackles) as found necessary, due to wastage in excess of allowable limits. The remaining part of the anchor chain cable lengths and Kenter shackles were at that time found to be in satisfactory condition.

It was discovered on investigation that the probable cause of the damage was the fracture of a Kenter shackle that had not been renewed in the previous dry dock.

Note that the intricate shape of the various parts of a Kenter shackle means that large forces are transferred through relatively small contact areas. Proper design and well machined faces and corners are very important for the durability of such shackles.

In the above case the failure may be attributed to mishandling of the Kenter shackle during the opening/ fitting operation. Since in most cases Kenter shackles on old anchor chains are rusty/frozen, and opening up and reassembly requires the use of heating or mechanical force, cracks are likely to develop and should result in replacement rather than re-use.

The lesson to be learnt from this incident is, when a chain cable length is replaced due to wear and tear, the Kenter shackle(s) are normally worn as well and should generally be replaced.

Safety Event

Published: 31 October 2005
Download: IMCA SF 10/05

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.