Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Failure of hydraulic fitting at pressure - DEV imca
Skip to content

Failure of hydraulic fitting at pressure

A member reports an incident in which a hydraulic fitting failed under pressure. The hydraulic fitting was part of a hydraulic intensifier panel used during live testing of a guillotine cutter and intensifier. (Hydraulic intensifiers are used to boost ROV pressure up to around 690 bar for various tooling requirements like cutters and linear override tools).

The fitting that failed connected a pressure gauge to the high pressure (output side) side of the intensifier and was an integral and permanent component of the equipment. The gauge was being used to monitor output pressure on the circuit while the cutter test was performed. This connection failure resulted in the high velocity ejection of the gauge under very high pressure. There were no injuries. The intensifier in question was removed.

Typical intensifier panel
Typical intensifier panel
Open fitting that held the gauge
Open fitting that held the gauge

Preliminary findings from our member’s investigations were:

  • The hydraulic fittings that connected the gauge to the intensifier were not 690 bar rated;
  • The other hydraulic fittings in this part of the circuit were not 690 bar rated;
  • Urgent checks revealed that there were several intensifier panels with non-rated fittings in service elsewhere.

Our member took the following actions:

  • All on-deck testing involving high pressure intensifiers was stopped immediately and any required testing was conducted in the water with a wire sample, until confirmation of correct fitting was made;
  • All worksites checked intensifiers and verified the specification with tooling department(s) and arranged for replacement or upgrade as necessary;
  • Steps were taken to upgrade affected units held onshore and these were systematically changed out with affected units offshore until all panels had the correct fittings.

It should be noted that this specification shortfall may not be limited to ROV intensifiers and therefore vigilance is recommended with all high pressure hydraulic equipment.


IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.