Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Dropped flexible pipe incident - DEV imca
Skip to content

Dropped flexible pipe incident

What happened?

A member notes an incident during lifting operations, resulting in dropped flexible pipe.

A 6tonne riser test piece (RTP) was being lifted in preparation for load testing the system.  The first end was lifted with winch wires attached to both ends.  The crane and a 20tonne winch for the first end were connected to the riser via an end fitting pull head.  The trailing 10tonne winch (2nd end) was attached using laced round slings.  An earlier decision was made to remove the factory end cap and utilize laced round slings instead, but no management of change (MoC) was issued.

The test piece was lifted, and the operation was paused.  The tailing winch operator perceived that there may have been insufficient wire on the winch drum to complete the transfer.  The decision was made to reverse the lift.  As the tailing winch was hauled in, the laced up round sling slipped free off the pipe and the test piece dropped approximately 23m.  A member of the crew had been working in the area where it landed only a few minutes previously.

No persons were injured as a result of this incident; however, it did have the potential to result in a more serious outcome.

This incident emphasizes the importance of:

  • Having clear, specific guidance for all operations;
  • Ensuring that all equipment is checked and approved prior to conducting a task;
  • Never underestimate the simplicity/routineness of the task.

Our member recommends a focus on:

  • The importance of intervention – accept it, welcome it, expect it;
  • Identifying, managing and communicating change using the MoC process;
  • Complacency with routine tasks;
  • Line of Fire hazards.

What were the causes?

  • Lack of intervention at key stages;
  • Incorrect application of laced round sling configuration;
  • Insufficient emphasis on preparation; no load test on hold back rigging;
  • The task was considered routine – a similar operation, although not the same, had been performed on a past project; there was no hazard identification (HAZID) performed on this procedure.

What actions were taken?

  • Ensure that all ‘non-standard or non-routine tasks’ are risk assessed and HAZID carried out;
  • Prepare clearly defined guidelines for laced round sling configurations and circulate consistently across fleet.

Members may wish to refer to:

Safety Event

Published: 16 July 2019
Download: IMCA SF 17/19

Relevant life-saving rules:
IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.