Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Crane anti-two block securing wire failure - DEV imca
Skip to content

Crane anti-two block securing wire failure

What happened?

During routine lifting activities, a vessel crane’s (auxiliary) anti-two block (A2B) suspension wires failed, causing the A2B weight assembly to fall along the crane wire to the crane block.  Lifting operations were suspended and an inspection was conducted on the auxiliary crane wire and A2B system.  No injuries to personnel were sustained as result of the incident.

What were the causes?

  • During inspection and function test of the A2B system, the actuation lever was found seized;
  • Testing and inspection had not been carried out in accordance with equipment operating instructions;
  • The crane operator’s daily checklist noted ‘testing’ of the A2B system. However, it was found that only visual inspections were performed;
  • The upper A2B suspension wires had parted at a position and in a fashion which suggested that the wires were severed by contact with the crane sheave and/or auxiliary wire. It is probable that the seized actuation lever prevented the A2B system from functioning correctly, allowing the crane block to pay-in past the ‘cut off point’, causing slack in the suspension wires and contact with the sheave.

What lessons were learnt?  What actions were taken?

  • Full and thorough inspection of crane A2B systems to confirm that they are maintained, functioning correctly and free of potential seizing (of the actuation level);
  • Inspection of equipment holdbacks/retention wires to identify potential for slack and/or entanglement with moving parts. Consider replacing wires with larger diameter;
  • Always comply with equipment pre-start checklist requirements, including function testing of equipment where specified;
  • Inspections should be appropriately documented to record subsequent findings/corrective actions, and records reviewed appropriately on a regular basis to verify effectiveness.

Members may wish to refer to:

Safety Event

Published: 25 July 2019
Download: IMCA SF 18/19

Relevant life-saving rules:
IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.