Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
Broken right hand index finger - DEV imca
Skip to content

Broken right hand index finger

A member has reported an incident in which a worker broke the index finger on his right hand. During a maintenance period it became necessary to deballast a methanol tank. As a result of the envisaged high work load there were three chief officers onboard and additional staff. The senior chief officer instructed the second chief officer to de-ballast the starboard tank through the port manifold Avery Hardoll connection to sea. It was known that the non-return valve (NRV) was not in place.

The second chief officer had noted on the previous day that the line was open and the Avery Hardoll cap was off, and therefore he started the pump. However, there was immediate back pressure showing on the gauge and no discharge was noted. The second chief officer concluded that the Avery Hardoll cap must in fact have still been on the line and so a deckhand was instructed to remove the cap. The deckhand stood to one side, and tried to move the cap by hand but was unsuccessful and therefore tapped it with a hammer. The cap was ejected from the manifold and struck the deckhand on his right hand, lacerating and breaking his index finger. The deckhand received first aid onboard and subsequently went to hospital for minor surgery to his finger.

Discharge manifold from which cap was blown
Discharge manifold from which cap was blown
Discharge manifold from which cap was blown
Discharge manifold from which cap was blown

Following investigation, the following points were noted:

  • The cap had not been removed from the discharge manifold prior to energising the pump and pressurising the line;
  • The second chief officer was experienced and the subject of good reports, who was not fatigued and acknowledged awareness of the procedure and the responsibility to ensure the lines were set up and the cap removed;
  • The assumption that the line was open was incorrect – the second chief officer acted out of character, made an incorrect assumption and did not follow procedures;
  • The risks associated with not having a NRV in place were not considered;
  • Had procedures been followed the incident would have been prevented;
  • The Avery Hardoll male connection was damaged and did not function as designed. Had it operated properly it would have sealed the pipework, preventing the pressure build up behind the cap;
  • Whilst the decision to use the line cannot be faulted (i.e. the lack of a NRV made the configuration all but identical to a water ballast tank which does not have an Avery Hardoll) the presence of a NRV would still have been a barrier against incident;
  • Having made the initial misjudgement and as a consequence pressurised the line, the task should have been stopped and a new toolbox talk convened to consider the risks and take appropriate action to mitigate them;
  • The root cause of the incident was failure to follow procedure and to stop the job once a deviation from the norm was experienced.

A number of lessons were drawn from this incident:

  • Had procedures been followed the accident would not have happened;
  • The presence of a NRV in this context would act as an additional safety barrier;
  • Having made the initial misjudgement and as a consequence pressurised the line, the task should have been stopped and a new tool box talk convened to consider the risks and take appropriate action to mitigate them.

Safety Event

Published: 27 January 2011
Download: IMCA SF 01/11

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.