Oil/chemical mapping and spill risk assessment in Saipem’s fleet
What was done
Saipem has performed spill risk assessments for all its construction vessels. Through a rigorous and consistent method, the assessments assign a risk level for all equipment on-board in order to evaluate the risk and to provide an order of priority for the implementation of mitigation measures.
There were three steps to the process:
- Mapping all the equipment capable of generating spills or otherwise releasing substances hazardous to the environment;
- Assessing the risk by evaluating the following:
- the probability of a spill or release;
- the magnitude of the consequences for the environment of that spill or release;
- Implementing prevention and mitigation measures.
A software tool (on MS Excel) was created containing all the information required for each piece of equipment assessed. This included:
- Item name and location;
- Name and type of the substance – oil or chemical – that might be spilt or released;
- Quantity of the oil/chemical that might be spilt;
- Pressure at which the substance is held or stored;
- Is the storage or the equipment subject to weather;
- Is the storage or the equipment at risk from damage by impact?
- What are the barriers put in place?
- Have there been leakages in the past?
- Is the equipment present in the maintenance register?
- Expected spill response time.
Results, Observations, Conclusions
After alignment of documents between vessels, a spill risk assessment takes place with a methodology that takes into consideration all the information outlined above. The output of this spill risk assessment identifies any criticalities in one or more items on-board of every vessel. The spill risk assessment can then be used to better evaluate the quantity and the location of the spill response equipment (spill kits, vacuum etc). Saipem has completed this mapping exercise and the spill risk assessment for its entire offshore construction fleet. The next step will be to share the results with the VMT and start the implementation of risk reduction measures where applicable.
Originally issued with the following reference(s): IMCA ESB 03/20
IMCA Contact
Nadine Robinson
Technical Adviser - Environmental Sustainability
Contact
Information Note Details
Published date: 6 March 2020
Information note ID: 1472
Downloads
IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.
IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.