Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
COVID-19 - An example of a risk assessment undertaken by an IMCA Diving Contractor - DEV imca
Skip to content

COVID-19 – An example of a risk assessment undertaken by an IMCA Diving Contractor

This Information Note contains a sample of a robust risk assessment recently undertaken by an IMCA Member.

In this example, the bowtie risk assessment methodology was selected and used to help the company identify appropriate measures for preventing the occurrence of contagious disease (in this case COVID-19) on a DSV. It was also employed to identify suitable control and recovery measures should cases nevertheless occur.

Used in conjunction with the guidelines in Novel Coronavirus (COVID-19) – Guidance for Diving Contractors (IMCA D 06/20), the Bowtie risk assessment approach was found by our Member to be one effective way of developing appropriate company procedures and safeguards to reduce the risk of COVID-19 disease on its diving projects so far as reasonably practicable.

The essential elements of the Bowtie Risk Assessment Method are shown in the diagram below:

The bowtie methodology has four underlying steps of risk assessment and risk management as shown below:

Example of COVID-19 Bowtie Risk Assessment for a Diving Project can be found in the PDF copy of the information note.

Originally issued with the following reference(s): IMCA D 16/20

Information Note Details

Published date: 23 April 2020
Information note ID: 1502


IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.