Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce-eu-vat-number domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/storm/sites/dev-imca-int-com-1/public/wp-includes/functions.php on line 6114
A firm place for lifting and rigging as an IMCA core activity - DEV imca
Skip to content

A firm place for lifting and rigging as an IMCA core activity

Published on 1 October 2017

IMCA’s Technical Manager Mark Ford writes in the Wire Rope Exchange (September-October 2017): Lifting and rigging is fundamental to almost every offshore and subsea operation, ranging from routinely lifting stores and spares, to the in-depth planning and execution of complicated engineered lifts …

Read the article on pages 74-76